I think i am missing some thing, tell me which allegations are you talking about, and i will collect as much info as i can.
But let me tell you here, as far my memory works, only PTI is the party who dismissed his own people who were corrupt, even IK dismissed leader of our resident because he was doing corruption and he was not doing fair usage of funds.
Some local lawyer filed a case against the leader and contacted PTI in Peshawar, gave them all the proves and with in 3 days the guy was dismissed. Though PTI lost a ticket, but they didn't care.
PTI the only party who dismissed gov officers who were doing corruption. And if you want proof you can check that in the previous government, the incidence of corruption in KP was the highest in the country as disclosed by the Transparency International in a report. But now KPK is on the lowest number of corruption, if i am not wrong there is also a thread about it.
What does this mean? It means that some where some one is doing a good job, that's why corruption rate is going down and down in KPK.
In PTI reign if we look for the record of last 2, a number of deputy superintendents of police (DSPs), inspectors, sub-inspectors, assistant sub-inspectors, head constables and constables were dismissed, reverted, censured or awarded other kind of punishments for corruption and misuse of power. Hundreds of cases are still pending against other officers.
While before PTI not a single officer of the Police Service of Pakistan (PSP) cadre was awarded any major punishment in the . A couple of them were removed from key positions on the basis of complaints that led to the dismissal of junior cops. And these PSP officers were given other key positions within no time.
Over 4,000 cops are punished so far due to corruption, and let me tell you it doesn't only include cops of junior level, but also senior level. Common example is removal of Mardan's DSP Abidur Rehman has been dismissed after charges against him were proved in the inquiry report.
16 patwaris and four evenue officials have been dismissed from my district ( If you ask, i can find you an article and can prove it and i am sure i am right, eye witness)
Free health facility in public or private hospitals for 32% poor and deserving population ( 81 lac people). First time in Pakistan, but only in
KPK.
cost= 1.8 billion
Dr Nasser Ali Khan vc Haripur university signing MOU With a Recter of Universty if Applied Sciences GRAZ (JOANNEUM) ÁUSTRIA ON 28/1/2016
New Salary Structure for KPK Teaching Hospitals, Employess will have to become Institutional Employees which means that they will come directly under that hospital (not directly under provincial government).
This means that the political interference will decrease and they will be more answerable to the hospital management (i.e. Board of Directors).
Revised Salary Structure highlights:
Fresh Doctor called Trainee Doctor (Grade 17): Salary increased from Rs. 65000 -> Rs. 120,000
Seniro Medical Officier / Senior Registrar (Grade 18): Salary increased from Rs.65,150 -> Rs. 200,000
Associate Professor (Grade 19): Salary increased from Rs. 88,000 -> Rs. 250,000
Chief Medical Officier (Grade 20): Salary increased from Rs. 105,000 -> Rs. 300,000
Professor (Grade 21): Salary increased from Rs. 118,000 -> Rs. 350,000
150 KW Mircro Hydro Power Project Completed in Rashang, Battagram. KP government funded 150 kW Micro Hydro Power Project completed and tested successfully. It will cater Union Council Rashang, Battagram. Approximately 350 households will enjoy the light.
First Time in History: KPK govt opens up government guest houses for the public through Tourism Department.
Traffic warden police equipped with body mounted cameras, These cameras are equipped with both voice and video recording.
Status Report of Energy and Power Sector Reforms (completion dates):
Policy Priorities
Focus on Hydel Power generation through Short, Medium and Long term interventions
Exploration & Exploitation of Oil & Gas Potential
Efficient utilization of Net Hydel Profits
Emphasis on development of viable alternative energy sources
Establishment of an Oil Refinery through PPP
Development of Community Driven Micro -Hydel Projects
Energy Conservation
Projects:
55 MW electricity will be generated till Dec, 2015.
61MW electricity will be generated till Dec, 2018.
153 MW electricity will be generated till Dec, 2019.
Machai Hydel Power Project with production capacity of 2.6 MW Mardan:
Will be completed by end of June,2015.
Ranolia Hydel Power Project with production capacity 17 MW Kohitsan:
Will be completed by end of June,2015
Daral Khwar 36 MW Swat:
Will be completed by end of December 2015.
Lawi 69 MW Chitral and Matiltan 84 MW Swat
Technical bids (both HPPs) opened on 5th February, 2015.
Financial bids will be opened by end of April,2015.
Koto 31 MW Dir Lower, Jabori 7 MW Manshera and Karora 10 MW Shangla Hydel Power Projects:
Approved by ECNEC.
EPC contract awarded.
Ready for inauguration.
Completion by June, 2018.
Management consultant selected.
Selection of Engineering,Procurement and Construction (EPC) contractor in process.
Hydel Power Projects (Sharmai Dir-150 MW, Shushai-Zhendoli Chitral -144 MW and Shogosin Chitral -132 MW):
Financial advisors (funds arranger firm) is being hired to get finances for these projects by selling shares in the existing projects.
356 Mini/Micro Hydel- Power projects in 12 districts at UC/Village level and community run:
207 projects upto SO KW will be completed by September,2015.
87 projects upto 150 KW will be completed by December,2015.
31 projects upto 250 KW will be completed by September, 2016.
31 projects will be completed by December, 2016.
Establishment of Oil Refinery:
Refinery will be built at Krappa (Distt Karak) and Power Plant will be established at Khushal Garh.
KP Oil a. Gas Company:
An Oil and Gas Company has been established with the objective to promote oil and gas exploration in the province.
Chief Executive Officer appointed.
KPOGCL Board constituted.
Signing of production agreement with OPL in process.
Negotiation with KUFPEC for Pharpur Block in process.
Purchase of 02% share in Tall Block in process.
2.5% investment in Pezu and Barathai Completed.
Joint Development Agreement (JOA) for construction of two projects i.e Lower Palas Kohistan 665 MW and Lower Spatgah Kohistan 496 MW:
JOA was expected to be signed but Korean Company is losing interest in the projects.
The progress is not encouraging.
200 villages by solar electrification by DC standalone system Phase-I (Southern and Central Districts), Phase-II(Northern Districts)
Phase-I:- MC hired, contract will be awarded soon.
Phase-II:- MC and contract under process.
Award of study for providing electricity from Pehur Hydel Station to Gadoon Industrial Estate:
Contract awarded.
Report of Phase-I submitted.
Report of Phase-II will be submitted by end of March,2015.
Feasibility of 03 site in Swat and Chitral ( Torcamp-Godubar HPP Distt Chitral 409 MW, Kari-Muskhur HPP Distt Chitral 446 MW, Gabral Kalam HPP Distt Swat 110 MW)
KPK Under Construction Hydro Power Plants (HPP)
View attachment 67024
45% work completed on Zamir Gul Irrigation Dam #Kohat.
The under construction Zamir Gul Dam is situated in the remote and far-flung village Ziarat Sheikh Allahdad of Southern District of Kohat on Kohat-Nizampur Road in PK-37. Annual Rainfall in the area is 22%. There is thousands of acres of barren land but due to no proper canal system its production ratio is negligible.
Now let me tell you in a short line about Education. We all know what were the conditions of education in KPK, even it was below Balochistan. And now in year 2016, the improvement percentage is 2nd highest 13.15 percent (mean while Punjab is declining at the rate of 3.38 percent)
SCU (Special Combat Unit) included in Police, KPK.
The list with me which shows how much good work has done by PTI is far far far better than list of how much bad things are done by PTI.
No party is perfect, every one has flaws, limitations. But the point is PTI is the only party who is trying its best to do something better for the KPK (not Only Peshawar). And this is what we people need.
[MENTION=137507]asyed[/MENTION] [MENTION=138254]Syed1[/MENTION] [MENTION=138980]TalentSpotterPk[/MENTION] and [MENTION=133397]WebGuru[/MENTION] i hope this post can give you more clearer image that why PTI is the best party, the people of KPK has ever seen.