Lets be honest here, the whole stadium repairing going on has been a massive Project Failure by PCB.
Hosting rights were given to PCB well in advance and the budget for stadium repairs were also given in advance as well. PCB should not have been completing the repairs by now. If someone is to bring up Nassau county stadium that was because the goal was to make a temporary stadium which is why they delayed it their.
PCB was suppose to fix the Rawalpindi, Karachi and Lahore Stadium. Meanwhile plans were to construct another stadium aswell in Islamabad or some other city of Punjab. Roofs were also planned for the stadiums aswell.
Ideally, they should had done all this before the Asia Cup which Pakistan was hosting and be ready for the ICC Champions Trophy. But the army and govt had other plans and in their political instability caused a massive delay in this project.
Almost all of the budget allocated has been wasted on Gadaffi Stadium. Plus, I am pretty sure ICC doesnt give out money to make your boards office which PCB seems to be doing currently. They are renovating their own office. The roof is not gonna be installed, and only a Lahori poster can tell us whats the parking situation at Gadaffi stadium.
New chairs, new stands, new screens and new flood lights have been installed there.
Meanwhile in Karachi, once they figure that the whole budget was being spent in lahore as they needed to employ more labor they stopped the work in Karachi. They had promised a new stand and a roof there and a trench but now nothing is being done there. The only thing they are doing is making a new media box/corporate box thats it. Catering the VIPs.
Than there is Rawalpindi. In Rawalpindi they decided to to install the old chairs of Gadaffi Stadium. No roof is gonna be installed. They didnt even bother to increase the stands at this 15k stadium. Parking is non existent as PCB doesnt want to stop the money it makes by giving its spaces to the restaurants.
Meanwhile no new stadium was made in Islamabad or any other city in Punjab. Also, for those of you who do not know this, Wahab Riaz had the Sialkot stadium demolished in Sialkot and they never did nay work on it later. So they also destroyed a somewhat working stadium.
The Lahore Stadium will turn out to be good at the end of the day, but remember that all the budget was allocated on it. Also i know many posters will say that the rest of the projects are promised in Phase 2 which is after the Champions trophy, this is Pakistan. Once the Champions trophy is over, the money goes in the pockets and there isnt going to be a phase 2. The whole purpose of the stadium rebuilt was to get it ready for ICC tournament, not for some series afterwards.
These guys have spent all the money on Gadaffi, and dont have funds for a phase 2 repair. The only chance they have if the govt allocates a budget in July than maybe phase 2 might get start
Hosting rights were given to PCB well in advance and the budget for stadium repairs were also given in advance as well. PCB should not have been completing the repairs by now. If someone is to bring up Nassau county stadium that was because the goal was to make a temporary stadium which is why they delayed it their.
PCB was suppose to fix the Rawalpindi, Karachi and Lahore Stadium. Meanwhile plans were to construct another stadium aswell in Islamabad or some other city of Punjab. Roofs were also planned for the stadiums aswell.
Ideally, they should had done all this before the Asia Cup which Pakistan was hosting and be ready for the ICC Champions Trophy. But the army and govt had other plans and in their political instability caused a massive delay in this project.
Almost all of the budget allocated has been wasted on Gadaffi Stadium. Plus, I am pretty sure ICC doesnt give out money to make your boards office which PCB seems to be doing currently. They are renovating their own office. The roof is not gonna be installed, and only a Lahori poster can tell us whats the parking situation at Gadaffi stadium.
New chairs, new stands, new screens and new flood lights have been installed there.
Meanwhile in Karachi, once they figure that the whole budget was being spent in lahore as they needed to employ more labor they stopped the work in Karachi. They had promised a new stand and a roof there and a trench but now nothing is being done there. The only thing they are doing is making a new media box/corporate box thats it. Catering the VIPs.
Than there is Rawalpindi. In Rawalpindi they decided to to install the old chairs of Gadaffi Stadium. No roof is gonna be installed. They didnt even bother to increase the stands at this 15k stadium. Parking is non existent as PCB doesnt want to stop the money it makes by giving its spaces to the restaurants.
Meanwhile no new stadium was made in Islamabad or any other city in Punjab. Also, for those of you who do not know this, Wahab Riaz had the Sialkot stadium demolished in Sialkot and they never did nay work on it later. So they also destroyed a somewhat working stadium.
The Lahore Stadium will turn out to be good at the end of the day, but remember that all the budget was allocated on it. Also i know many posters will say that the rest of the projects are promised in Phase 2 which is after the Champions trophy, this is Pakistan. Once the Champions trophy is over, the money goes in the pockets and there isnt going to be a phase 2. The whole purpose of the stadium rebuilt was to get it ready for ICC tournament, not for some series afterwards.
These guys have spent all the money on Gadaffi, and dont have funds for a phase 2 repair. The only chance they have if the govt allocates a budget in July than maybe phase 2 might get start